
Commercial · Case Study
Café Fitout, South Yarra
System
Food-Grade Epoxy
Size
85 m²
Duration
3 days
Category
Commercial
Brief
The problem
Existing slab was tired, with surface cracking and an inconsistent finish. The owners wanted a single, premium surface — durable enough for daily use and beautiful enough to be on display.
Approach
The solution
Diamond grinding to CSP 2, joint stitching, two coats of Food-Grade Epoxy laid over two working days with a polyaspartic top coat.
Outcome
The result
A flawless, jointless, mirror-grade finish handed over inside the original quoted window. Walk-on same evening, drive-on the next day.


