Outdoor · Case Study
Rooftop Deck Coating, CBD
System
Concrete Coating
Size
180 m²
Duration
3 days
Category
Outdoor
Brief
The problem
Existing slab was tired, with surface cracking and an inconsistent finish. The owners wanted a single, premium surface — durable enough for daily use and beautiful enough to be on display.
Approach
The solution
Diamond grinding to CSP 2, joint stitching, two coats of Concrete Coating laid over two working days with a polyaspartic top coat.
Outcome
The result
A flawless, jointless, mirror-grade finish handed over inside the original quoted window. Walk-on same evening, drive-on the next day.