Rooftop Deck Coating, CBD
Outdoor · Case Study

Rooftop Deck Coating, CBD

System
Concrete Coating
Size
180 m²
Duration
3 days
Category
Outdoor
Brief

The problem

Existing slab was tired, with surface cracking and an inconsistent finish. The owners wanted a single, premium surface — durable enough for daily use and beautiful enough to be on display.

Approach

The solution

Diamond grinding to CSP 2, joint stitching, two coats of Concrete Coating laid over two working days with a polyaspartic top coat.

Outcome

The result

A flawless, jointless, mirror-grade finish handed over inside the original quoted window. Walk-on same evening, drive-on the next day.